Westland Shopping Centre
Renovation of the existing 38,000 m² shopping centre and extension of two new areas by 12,000 m.
HVAC
- Heating capacity: 4,000 kw
- Cooling capacity: 5,200 kw
- Geothermal: 700 kw
- Air curtains: 21 rooms for 500 Kw
- Air handling units: 75,000 m3/h with adiabatic cooling.
- Integrating meters: 119 pieces
Electro
- Electricity for the Mall, North and South extensions
- High voltage connections
- Electrical panels
- Routes and cabling
- KNX management
- Sound equipment
- Data
- Fire detection
- Astrid network
- Lighting
- Building Management System: VMANAGER
- Breeam : Excellent
- Work in shifts: 24 hours a day, 6 days a week
Building Technologies
Electro
HVAC
VMANAGER
Information about the project
Location
Anderlecht
Principal
AG Real Estate
Execution time
2020 - 2021 - 2022
Budget
HVAC: +- € 5.200.000
Electro: +- € 3.800.000