Renovation of the existing 38,000 m² shopping centre and extension of two new areas by 12,000 m.

HVAC

  • Heating capacity: 4,000 kw
  • Cooling capacity: 5,200 kw
  • Geothermal: 700 kw
  • Air curtains: 21 rooms for 500 Kw
  • Air handling units: 75,000 m3/h with adiabatic cooling.
  • Integrating meters: 119 pieces

Electro

  • Electricity for the Mall, North and South extensions
  • High voltage connections
  • Electrical panels
  • Routes and cabling
  • KNX management
  • Sound equipment
  • Data
  • Fire detection
  • Astrid network
  • Lighting

 

  • Building Management System: VMANAGER
  • Breeam : Excellent
  • Work in shifts: 24 hours a day, 6 days a week
Building Technologies

Electro
HVAC
VMANAGER

Information about the project

Location

Anderlecht

Principal

AG Real Estate

Execution time

2020 - 2021 - 2022

Budget

HVAC: +- € 5.200.000