Puming Flood Prevention
Information about the project
Hanoi City, Vietnam
CFE
2013 - 2015
Hanoi Sewerage and Drainage Company (HSDC)
9.940.000,00 €
Preparation of civil engineering guide plans, supply of 6 auger pumps with a capacity of 3m³/s each, 3 vertical pumps with a capacity of 3m³/s each, automated rough screening & fine screening (PS2), hydraulic valves & stop logs, lifting equipment, instrumentation, low voltage electrical panels, systems automation and monitoring, centralised remote control for the three pumping stations.
Engineering Firm: CFE
![Pumping - Flood Control](https://www.vma.be/sites/default/files/styles/reference/public/2021-11/pumping_flood_vietnam_8.jpg?h=e45817f3&itok=qjfZ00fi)
![Pumping - Flood Control](https://www.vma.be/sites/default/files/styles/reference/public/2021-11/pumping_flood_vietnam_1.jpg?h=854a7be2&itok=6UbhETQK)
![Pumping - Flood Control](https://www.vma.be/sites/default/files/styles/reference/public/2021-11/pumping_flood_vietnam_3.jpg?h=4c014314&itok=s4nKh5vh)
![Pumping - Flood Control](https://www.vma.be/sites/default/files/styles/reference/public/2021-11/pumping_flood_vietnam_2.jpg?h=e59c519e&itok=-eghkYaJ)
![Pumping - Flood Control](https://www.vma.be/sites/default/files/styles/reference/public/2021-11/pumping_flood_vietnam_9_3.jpg?h=a1e1a043&itok=6SWbSeUc)
![Pumping - Flood Control](https://www.vma.be/sites/default/files/styles/reference/public/2021-11/pumping_flood_vietnam_9_2.jpg?h=a1e1a043&itok=4H-LQ9Aj)
![Pumping - Flood Control](https://www.vma.be/sites/default/files/styles/reference/public/2021-11/pumping_flood_vietnam_9_4.jpg?h=a1e1a043&itok=HYqD8uWF)
![Pumping - Flood Control](https://www.vma.be/sites/default/files/styles/reference/public/2021-11/pumping_flood_vietnam_6.jpg?h=a1e1a043&itok=UrOjTfXE)