Leonidas

The Technical Recipe for an Exceptional Chocolate VMA’s experts combined their expertise in refrigeration, HVAC and energy performance to support the Leonidas team in the design, engineering and execution of all technical installations. From chilled water systems operating at different temperature regimes – including one down to -18°C – to the ventilation of the various production areas, offices and sanitary facilities. Particular attention was paid to the thermal control of storage areas and the optimisation of production lines. All installations were designed to ensure reliability, high performance and optimal energy efficiency. Tailor-Made Installations Supporting International Growth The complex includes, among other things, an ultramodern production unit, temperature-controlled storage areas and functional office spaces. Each element was designed to meet the strict requirements of the food industry and to support Leonidas’ international expansion. Thanks to this collaboration, Leonidas now benefits from highly efficient technical infrastructures […]
GZA Hospitals

Integrated technical upgrades across three hospital campuses Under a long-term framework agreement, VMA is responsible for the comprehensive renewal of critical technical installations across three GZA hospital campuses, including associated residential care facilities. Our teams are carrying out a wide range of electrical and HVAC works in high-stakes environments, from patient and operating rooms to […]
Westland Shopping

Smart renovation and sustainable expansion of a major retail hub VMA recently completed the opening of three new retail zones—North, South, and West—as part of a strategic extension and renovation of an existing 38,000 m² shopping mall. This was a complex project carried out in phases to ensure ongoing retail operations. Industry 4.0 in action […]
La Lorraine Erpe-Mere

The solution For this expansion project, La Lorraine partnered with VMA’s specialized teams for all electrical works and, more recently, for HVAC installations as well. By integrating innovative low-voltage systems and emergency battery solutions, VMA was able to enhance production processes without disrupting daily operations.
Scholen van Morgen Herentals

The HVAC installation is designed to ensure optimal indoor comfort and energy efficiency. It includes four wall-mounted gas boilers delivering a combined output of 400 kW, as well as a split-type heat pump system. The dry cooler is installed on the roof, while the indoor heat pump provides an additional 250 kW of thermal capacity. […]
PXL Hogeschool Building H

Technical highlights The project leverages innovative technologies that prioritize not only energy efficiency but also ease of use and long-term reliability. The integrated monitoring system tracks energy consumption and water usage, including the breakdown of hot water, rainwater, and total water flow. Automated leak detection adds an extra layer of safety and control. The building […]
Hotel van der Valk Ghent

All building systems under one roof For this project, VMA was responsible for the complete execution of all building-related technical systems. Thanks to our multidisciplinary expertise, we were able to act as a single point of contact for all technical domains, resulting in streamlined coordination and increased efficiency throughout the project. Project scope Flexibility as […]
Wood Hub

A comfortable and sustainable workplace The new headquarters of CFE, BPI and BPC had to reflect the group’s values: innovation and sustainability, with a strong focus on people and supporting their work. That vision materialized in Wood Hub, built with the unique hybrid CREE® system of timber and concrete, which reduces CO₂ emissions by nearly […]
Howest Bruges

Sustainability as a core value The new buildings comply with strict Nearly Zero Energy Building standards and use renewable energy sources such as geothermal energy for 80% of their heating requirements. Water reuse is another key feature of the design: wastewater is purified on-site and, along with buffered rainwater, reused in the facility. This approach […]
Garden Stores Louise

A renovation in the spirit of energy transition The original building relied on an outdated gas installation. VMA completely dismantled this system and replaced it with two modern heat pumps on the ground floor (2 x 30 kW) and a larger 130 kW heat pump on the sixth floor. A powerful air handling unit ensures optimal air […]
Gare Maritime

Energieneutrale overdekte stad
Monteco

Together with VMANAGER, BPC and Woodshapers, VMA took on the challenge of developing an energy performance and management system based entirely on renewable energy—while ensuring a comfortable indoor climate all year round. VMA was responsible for the technical installations; VMANAGER provided the building management system. Mission accomplished. The Monteco office building relies exclusively on renewable […]
VMA Office Sint Martens Latem

Office focused on technology and workplace comfort The office building includes workspaces, meeting rooms, technical areas, and support services, spread across three floors. All spaces are designed with a focus on ergonomics, visual comfort, and digital accessibility. The building serves as a showcase of what is possible in the field of integrated building technologies, with […]
FILAO

De eerste geïntegreerde Belgische PET-flessenrecyclingfabriek
Grand Hôpital de Charleroi

Creating the optimal hospital environment A pleasant and, above all, healthy indoor climate contributes to the recovery of patients and the well-being of staff and visitors. Grand Hôpital de Charleroi relied on VMA’s proven expertise for part of its HVAC systems. VMA installed 11 MW of heating capacity using boilers, combined heat and power (CHP) […]