Leisure

We offer tailor-made total solutions for complex projects, including the construction and renovation of museums, swimming pools and other specialized infrastructures. 

With a wide range of services and expertise from our operational locations, we deliver solutions that combine functionality, sustainability and innovation.  

Our specializations include: 

Electrical engineering

Advanced electrical installations that guarantee reliability and energy efficiency. 

HVAC

High-quality climate control systems for optimal temperature and air quality, essential for museums and swimming pools. 

Smart & Sustainable Building Management

Intelligent systems that optimize energy management and automation, with a focus on sustainability. 

Cooling

Efficient and environmentally friendly cooling techniques, custom designed for swimming pools and other applications. 

Maintenance

Preventive and curative maintenance to maximize the life and performance of installations. 

Future-proof solutions for unique buildings

Our approach is focused on developing innovative, future-proof solutions that meet the specific needs of these unique buildings.  

By working closely with our customers, we create spaces that not only meet technical and functional requirements, but also contribute to comfort, sustainability and user experience. 

Why VMA for your project?

  • We take care of your project from A to Z. Our experienced teams think flexibly with you, from study and engineering to realization and maintenance.
  • Efficient cooperation, craftsmanship and flexibility are standard on every project.
  • We strive for operational excellence to exceed your expectations.
  • VMA helps you save costs. We go for sustainability and help you improve the energy efficiency of your building or facility.
  • Your solution is at hand. With a dozen locations across Belgium, there is always a branch near you. With a single point of contact, you have access to all VMA expertise.

Our projects

Your project, our expertise.
Discuss your projects and installations.

Pairi Daiza

Thanks to our advanced technologies and close collaboration with POLY-TECH Engineering, we implemented a ventilation system and ice-making units to maintain a constant temperature of 5°C and produce an artificial ice layer.

Search