All building systems under one roof
For this project, VMA was responsible for the complete execution of all building-related technical systems. Thanks to our multidisciplinary expertise, we were able to act as a single point of contact for all technical domains, resulting in streamlined coordination and increased efficiency throughout the project.
Project scope
- Electrical installations: high-voltage, low-voltage, lighting, emergency power, data cabling, and fire detection
- HVAC systems: including all ventilation and cooling installations
- Sanitary systems: covering all plumbing and water-related components
Flexibility as a strength
One of the main challenges during this project was the evolving nature of the construction process. The hotel design was adapted several times throughout the execution phase, requiring continuous adjustments to plans and implementation.
Rather than seeing this as an obstacle, VMA focused on finding practical solutions. With short communication lines, strong internal coordination, and technically flexible teams, we were able to respond quickly to every change—without compromising on quality or deadlines.
Quality through partnership
The collaboration between VMA, Jansen Building, and Van der Valk was built on trust. VMA played a proactive role not only during execution but also in the early design phase. We contributed insights on technical optimisations and adapted plans throughout the project with agility and foresight.
“We are very proud of the quality we deliver, and our brand is beginning to reflect that. The partners we work with really represent quality.”
Max Van der Valk, Developer Hotel Van der Valk