High-voltage expertise powering a future-ready data center
At Green Energy Park, VMA provided end-to-end expertise in high-voltage installations, from feasibility studies to full implementation. The intake substations ensure seamless power supply to the campus, while rigorous Level-5 testing simulates peak loads to verify operational reliability under all circumstances.

Redundancy and reliability in a complex environment
Certified with a Tier-3 classification, Green Energy Park guarantees an exceptional uptime of 99.982%. The infrastructure is designed for full redundancy, ensuring uninterrupted operations—even during scheduled maintenance. The system includes step-up transformers and emergency generators, providing consistent backup power and resilience against grid disruptions.
Intelligent low-voltage distribution
VMA also managed the sophisticated low-voltage distribution system, integrating power panels, busbars, fire detection, and access control. With a total capacity of 12.5 MW for both energy intake and injection, the infrastructure is ideally suited for a high-performance data center environment.


Trusted partnership with proven results
This project was developed in close collaboration with Ghelamco, a long-standing VMA client. Our reputation for delivering quality technical solutions on time helped make this ambitious project a success. The Green Energy Park showcases how high-end engineering and reliable execution can enable innovation at scale.
Scope of works delivered by VMA:
- High-voltage systems (intake substations, transformers, Level-5 testing)
- Low-voltage distribution (power panels, busbars)
- UPS systems and emergency generators
- Lighting and emergency lighting
- Fire detection and access control