GZA Hospitals

Integrated technical upgrades across three hospital campuses Under a long-term framework agreement, VMA is responsible for the comprehensive renewal of critical technical installations across three GZA hospital campuses, including associated residential care facilities. Our teams are carrying out a wide range of electrical and HVAC works in high-stakes environments, from patient and operating rooms to […]

Westland Shopping

Smart renovation and sustainable expansion of a major retail hub VMA recently completed the opening of three new retail zones—North, South, and West—as part of a strategic extension and renovation of an existing 38,000 m² shopping mall. This was a complex project carried out in phases to ensure ongoing retail operations. Industry 4.0 in action […]

Delhaize Winery

The project VMA was entrusted with the complete delivery of electrical installations for Delhaize’s new wine bottling plant, covering both low-voltage and high-voltage systems. The scope of work included: Low-voltage installations:Data cabling, server racks, fire detection systems, and wiring for access control and intrusion detection. High-voltage installations:Main and secondary distribution boards, lighting systems, and cabling […]

La Lorraine Erpe-Mere

The solution For this expansion project, La Lorraine partnered with VMA’s specialized teams for all electrical works and, more recently, for HVAC installations as well. By integrating innovative low-voltage systems and emergency battery solutions, VMA was able to enhance production processes without disrupting daily operations.

Ghelamco Green Energy Park

High-voltage expertise powering a future-ready data center At Green Energy Park, VMA provided end-to-end expertise in high-voltage installations, from feasibility studies to full implementation. The intake substations ensure seamless power supply to the campus, while rigorous Level-5 testing simulates peak loads to verify operational reliability under all circumstances. Redundancy and reliability in a complex environment […]

PXL Hogeschool Building H

Technical highlights The project leverages innovative technologies that prioritize not only energy efficiency but also ease of use and long-term reliability. The integrated monitoring system tracks energy consumption and water usage, including the breakdown of hot water, rainwater, and total water flow. Automated leak detection adds an extra layer of safety and control. The building […]

Hotel van der Valk Ghent

All building systems under one roof For this project, VMA was responsible for the complete execution of all building-related technical systems. Thanks to our multidisciplinary expertise, we were able to act as a single point of contact for all technical domains, resulting in streamlined coordination and increased efficiency throughout the project. Project scope Flexibility as […]

Wood Hub

A comfortable and sustainable workplace The new headquarters of CFE, BPI and BPC had to reflect the group’s values: innovation and sustainability, with a strong focus on people and supporting their work. That vision materialized in Wood Hub, built with the unique hybrid CREE® system of timber and concrete, which reduces CO₂ emissions by nearly […]

Mobilis

An architectural and technical tour de force The Mobilis building stands out for its bold and innovative architecture. A striking feature is that several intermediate floors are suspended from the upper levels via a complex steel structure. This unique approach posed specific challenges, particularly in integrating the fire detection systems into the intricate framework of […]

Howest Bruges

Sustainability as a core value The new buildings comply with strict Nearly Zero Energy Building standards and use renewable energy sources such as geothermal energy for 80% of their heating requirements. Water reuse is another key feature of the design: wastewater is purified on-site and, along with buffered rainwater, reused in the facility. This approach […]

Search